Distances along the SLD between structures will be measured using a cherry-picker retrofitted with an odometer that is accurate to ± 5 feet. This instrument will be calibrated daily while the surveying is being performed. The vertical measurements will be taken with a pocket tape measure along the SLD lining, and from the markings along the sediment probe to measure the depth of water above the sediment. These devices will be inspected daily.