Continuous water monitoring at Station B (discharge from San Luis Drain), June 2003.

Show explanation of footnotes and agency abbreviations

PARAMETER Flow Temperature Boron Specific Conductance Selenium (total) Selenium (total) Load
DATA SOURCE USBR USBR CVRWQCB CVRWQCB CVRWQCB Computed
UNITS cfs °C mg/L µS/cm µg/L lbs
43
25.1
7.3
4,130
35.1
8.1
Jun-02-2003
42
25.5
7.3
4,260
37.0
8.4
Jun-03-2003
42
26.3
7.9
4,430
39.0
8.8
Jun-04-2003
43
26.4
7.9
4,550
41.8
9.7
Jun-05-2003
42
26.1
8.1
4,450
41.3
9.4
Jun-06-2003
44
25.4
8.4
4,930
41.8
9.9
Jun-07-2003
45
25.1
8.6
4,850
39.3
9.5
Jun-08-2003
49
24.9
8.4
4,740
35.6
9.4
Jun-09-2003
48
25.1
8.9
4,840
34.4
8.9
Jun-10-2003
43
24.3
8.6
4,720
32.9
7.6
Jun-11-2003
45
23.1
8.0
4,500
31.7
7.7
Jun-12-2003
43
22.4
7.8
4,420
34.6
8.0
Jun-13-2003
40
22.6
8.3
4,560
34.7
7.5
Jun-14-2003
42
22.9
8.6
4,760
40.8
9.2
Jun-15-2003
50
23.5
8.6
4,650
32.7
8.8
Jun-16-2003
52
24.6
8.5
4,720
31.2
8.8
Jun-17-2003
52
25.8
8.0
4,640
39.2
11.0
Jun-18-2003
51
25.8
7.8
4,630
45.2
12.4
Jun-19-2003
47
24.3
7.6
4,530
38.8
9.8
Jun-20-2003
48
22.7
8.8
4,740
50.2
13.0
Jun-21-2003
47
22.5
8.7
4,650
48.1
12.2
Jun-22-2003
49
22.8
8.3
4,590
45.3
12.0
Jun-23-2003
51
23.0
8.3
4,690
55.4
15.2
Jun-24-2003
57
23.0
8.3
4,760
51.7
15.9
Jun-25-2003
58
24.1
8.4
4,710
45.4
14.2
Jun-26-2003
56
25.6
8.0
4,580
49.1
14.8
Jun-27-2003
51
26.9
7.7
4,470
46.6
12.8
Jun-28-2003
48
27.5
7.8
4,430
47.6
12.3
Jun-29-2003
52
27.4
7.8
4,400
48.8
13.7
Jun-30-2003
53
27.0
7.9
4,360
42.4
12.1
Mean
48
24.7
8.2
4,590
41.3
10.7
Total Acre-feet
2,840
 
 
 
Total (lbs)
321
Load Limitation for June 2003 (lbs)
397