Continuous water monitoring at Station B (discharge from San Luis Drain), November 2001

Show explanation of footnotes and agency abbreviations

PARAMETER Flow Temperature Boron Specific Conductance Selenium (total) Selenium (total) Load
DATA SOURCE USBR USBR CVRWQCB CVRWQCB CVRWQCB Computed
UNITS cfs °C mg/L µS/cm µg/L lbs
Nov-01-2001
20
17.7
P
4,170
33.3
3.6
Nov-02-2001
19
17.7
P
4,160
31.8
3.3
Nov-03-2001
19
17.8
P
4,240
33.6
3.4
Nov-04-2001
20
18.0
P
4,280
35.9
3.9
Nov-05-2001
21
18.0
P
4,330
37.6
4.3
Nov-06-2001
21
17.9
P
4,110
39.8
4.5
Nov-07-2001
20
17.1
P
3,790
31.4
3.4
Nov-08-2001
20
16.7
P
3,910
41.8
4.5
Nov-09-2001
19
16.9
P
4,030
45.5
4.7
Nov-10-2001
17
16.8
P
4,310
56.6
5.2
Nov-11-2001
18
17.3
P
4,570
64.2
6.2
Nov-12-2001
22
16.9
P
4,020
46.6
5.5
Nov-13-2001
27
16.2
P
3,720
39.6
5.8
Nov-14-2001
37
16.6
P
3,780
38.1
7.6
Nov-15-2001
28
16.7
P
3,690
27.4
4.1
Nov-16-2001
24
16.7
P
4,080
32.4
4.2
Nov-17-2001
24
16.3
P
4,160
40.3
5.2
Nov-18-2001
24
15.9
P
4,290
51.7
6.7
Nov-19-2001
22
15.5
P
4,180
51.9
6.2
Nov-20-2001
21
15.3
P
3,660
35.5
4.0
Nov-21-2001
20
15.2
P
3,540
25.5
2.8
Nov-22-2001
21
15.5
P
4,020
45.1
5.1
Nov-23-2001
22
15.2
P
4,160
51.6
6.1
Nov-24-2001
21
14.5
P
4,340
57.3
6.5
Nov-25-2001
21
13.4
P
4,330
55.6
6.3
Nov-26-2001
23
12.7
P
4,130
44.2
5.5
Nov-27-2001
21
11.6
P
4,050
38.6
4.4
Nov-28-2001
21
10.8
P
4,290
43.8
5.0
Nov-29-2001
21
10.4
P
4,340
44.7
5.1
Nov-30-2001
22
11.1
P
4,360
46.9
5.6
.
.
.
.
.
.
.
Mean
22
15.6
P
4,100
42.3
 
Total
 
 
 
 
 
148
Load Limitation for November 2001 (lbs)
315