Continuous water monitoring at Station B (discharge from San Luis Drain), November 2000.

Show explanation of footnotes and agency abbreviations

PARAMETER Flow Temperature Boron Specific Conductance Selenium (total) Selenium (total) Load
DATA SOURCE USBR USBR CVRWQCB CVRWQCB CVRWQCB Computed
UNITS cfs °C mg/L µS/cm µg/L lbs
Nov-01-2000
21
15.5
6.6
3,960
25.0
2.8
Nov-02-2000
20
15.7
6.9
3,950
26.6
2.9
Nov-03-2000
21
16.1
6.9
4,130
46.1
5.2
Nov-04-2000
25
16.4
6.3
3,850
43.4
5.9
Nov-05-2000
24
16.5
6.8
3,770
30.3
3.9
Nov-06-2000
20
15.9
6.8
3,890
34.4
3.7
Nov-07-2000
19
14.3
6.9
3,930
42.7
4.4
Nov-08-2000
19
14.4
6.2
4,350
73.1
7.5
Nov-09-2000
19
14.3
6.6
4,420
67.0
6.9
Nov-10-2000
18
13.8
5.9
3,750
42.8
4.2
Nov-11-2000
17
13.2
5.7
3,720
45.1
4.1
Nov-12-2000
18
12.6
6.1
3,900
46.0
4.5
Nov-13-2000
17
12.2
6.8
4,220
53.1
4.9
Nov-14-2000
17
12.1
7.3
4,430
59.6
5.5
Nov-15-2000
17
11.7
7.2
4,470
61.4
5.6
Nov-16-2000
19
12.0
7.2
4,500
60.0
6.1
Nov-17-2000
19
11.8
7.1
4,530
69.0
7.1
Nov-18-2000
19
11.6
7.0
4,510
69.1
7.1
Nov-19-2000
19
11.6
7.1
4,430
59.0
6.0
Nov-20-2000
18
11.6
7.2
4,410
55.2
5.4
Nov-21-2000
19
11.5
7.2
4,380
56.5
5.8
Nov-22-2000
19
11.7
7.5
4,430
59.9
6.1
Nov-23-2000
22
11.4
7.3
4,450
63.7
7.6
Nov-24-2000
21
11.4
7.2
4,530
70.7
8.0
Nov-25-2000
20
11.5
7.3
4,430
64.7
7.0
Nov-26-2000
20
11.2
7.5
4,410
58.2
6.3
Nov-27-2000
22
11.3
7.5
4,340
57.2
6.8
Nov-28-2000
22
11.4
7.6
4,340
61.4
7.3
Nov-29-2000
22
10.8
7.5
4,550
62.2
7.4
Nov-30-2000
22
11.1
7.5
4,330
68.1
8.1
 
.
.
.
.
.
.
Mean
20
12.9
7.0
4,240
54.4
 
Total
 
 
 
 
 
174
Load Limitation for November 2000 (lbs)
348