Continuous water monitoring at Station B (discharge from San Luis Drain), January 1999.

Show explanation of footnotes and agency abbreviations

PARAMETER Flow Temperature Boron Specific Conductance Selenium (total) Selenium (total) Load
DATA SOURCE USBR USBR CVRWQCB CVRWQCB CVRWQCB Computed
UNITS cfs °C mg/L µS/cm µg/L lbs
Jan-01-1999
25.0 e
8.9
7.8
5,220
77.5
10.4
Jan-02-1999
27.0 e
8.9
8.0
5,020
63.8
9.3
Jan-03-1999
24.0 e
8.8
8.1
4,940
57.1
7.4
Jan-04-1999
25.0 e
8.6
8.5
5,280
64.5
8.7
Jan-05-1999
24.0 e
8.3
7.8
4,830
52.4
6.8
Jan-06-1999
23.0 e
8.1
7.7
4,450
52.8
6.5
Jan-07-1999
25.0 e
7.7
7.7
4,620
52.1
7.0
Jan-08-1999
25.4
7.6
7.5
4,880
79.6
10.9
Jan-09-1999
28.2
7.3
7.7
4,650
61.3
9.3
Jan-10-1999
31.2
7.0
7.6
4,660
59.3
10.0
Jan-11-1999
28.0
6.6
7.7
4,630
56.2
8.5
Jan-12-1999
27.1
6.2
7.7
4,590
61.4
9.0
Jan-13-1999
22.0
6.2
7.8
4,620
56.5
6.7
Jan-14-1999
23.5
6.5
7.8
4,570
63.5
8.0
Jan-15-1999
21.2
7.8
7.2
4,640
65.5
7.5
Jan-16-1999
24.4
9.8
7.2
5,060
121
15.9
Jan-17-1999
24.3
11.7
6.8
4,650
76.9
10.1
Jan-18-1999
25.8
12.7
6.7
4,570
63.4
8.8
Jan-19-1999
26.5
13.0
7.0
4,660
54.2
7.7
Jan-20-1999
25.6
13.1
7.1
4,650
59.3
8.2
Jan-21-1999
29.2
12.8
7.2
4,720
53.8
8.5
Jan-22-1999
27.8
13.0
7.2
4,690
56.7
8.5
Jan-23-1999
28.8
12.7
7.5
4,630
58.9
9.1
Jan-24-1999
27.4
11.8
7.4
4,790
62.2
9.2
Jan-25-1999
30.4
11.4
7.1
4,530
55.3
9.1
Jan-26-1999
31.8
10.0
7.0
4,730
66.5
11.4
Jan-27-1999
30.9
9.7
6.9
4,690
62.2
10.4
Jan-28-1999
34.9
9.8
6.8
4,360
57.3
10.8
Jan-29-1999
33.8
9.9
7.1
4,590
49.1
9.0
Jan-30-1999
35.8
9.9
7.0
4,510
52.5
10.1
Jan-31-1999
38.9
9.9
7.1
4,640
53.4
11.2
Mean
27.6
9.5
7.4
4,710
62.1
Total
284
Load Limitation for January 1999 (lbs)
506