Continuous water monitoring at Station B (discharge from San Luis Drain), April 2000.

Show explanation of footnotes and agency abbreviations

PARAMETER Flow Temperature Boron Specific Conductance Selenium (total) Selenium (total) Load
DATA SOURCE USBR USBR CVRWQCB CVRWQCB CVRWQCB Computed
UNITS cfs °C mg/L µS/cm µg/L lbs
Apr-01-2000
42
18.0
8.1
5,290
83.9
19.0
Apr-02-2000
43
19.7
7.9
5,240
85.5
19.8
Apr-03-2000
44
21.2
7.8
5,330
84.2
20.0
Apr-04-2000
42
21.8
7.9
5,270
80.0
18.1
Apr-05-2000
45
21.6
7.5
5,080
77.8
18.9
Apr-06-2000
46
21.5
7.3
5,090
81.6
20.2
Apr-07-2000
40 e
NA
7.4
4,970
83.5
18.0
Apr-08-2000
38 e
NA
7.1
4,880
80.6
16.5
Apr-09-2000
41 e
NA
7.2
4,910
83.2
18.4
Apr-10-2000
39 e
NA
7.1
4,890
83.1
17.5
Apr-11-2000
42 e
NA
8.5
5,070
80.0
18.1
Apr-12-2000
38 e
NA
7.4
4,720
62.8
12.9
Apr-13-2000
37 e
NA
7.3
4,700
60.6
12.1
Apr-14-2000
35
20.9
8.4
5,410
83.7
15.8
Apr-15-2000
38
20.2
8.0
5,090
70.4
14.4
Apr-16-2000
41
19.0
8.5
5,390
79.9
17.7
Apr-17-2000
45 e
NA
8.6
5,490
79.9
19.4
Apr-18-2000
50 e
NA
8.5
5,380
80.0
21.6
Apr-19-2000
76 e
NA
7.6
5,140
77.0
31.6
Apr-20-2000
72 e
NA
7.0
4,750
74.4
28.9
Apr-21-2000
57 e
NA
5.5
3,860
57.1
17.6
Apr-22-2000
54
19.9
5.8
4,070
57.0
16.6
Apr-23-2000
48
19.9
6.4
4,460
62.9
16.3
Apr-24-2000
44
20.0
7.1
4,900
68.5
16.3
Apr-25-2000
44
20.6
7.7
5,270
74.3
17.6
Apr-26-2000
43
21.2
8.2
5,390
72.5
16.8
Apr-27-2000
41
22.2
8.4
5,460
77.3
17.1
Apr-28-2000
38
21.0
8.7
5,590
87.9
18.0
Apr-29-2000
39
20.4
8.6
5,540
78.4
16.5
Apr-30-2000
41
21.2
8.4
5,520
77.2
17.1
Mean
45
21
8
5,070
76.2
 
Total
 
 
 
 
 
549
Load Limitation for April 2000 (lbs)
719