Continuous water monitoring at Station B (discharge from San Luis Drain), November 1999.

Show explanation of footnotes and agency abbreviations

PARAMETER Flow Temperature Boron Specific Conductance Selenium (total) Selenium (total) Load
DATA SOURCE USBR USBR CVRWQCB CVRWQCB CVRWQCB Computed
UNITS cfs °C mg/L µS/cm µg/L lbs
Nov-01-1999
30
17.6
7.4
4,750
42.5
6.9
Nov-02-1999
31
17.6
7.5
4,730
41.5
6.9
Nov-03-1999
33
17.5
7.4
4,760
46.7
8.3
Nov-04-1999
22
17.2
7.1
4,680
38.7
4.6
Nov-05-1999
31
17.7
7.3
4,690
35.8
6.0
Nov-06-1999
30
17.6
7.4
4,700
45.4
7.3
Nov-07-1999
29
17.2
7.4
4,710
53.0
8.3
Nov-08-1999
34
16.9
6.7
4,440
50.0
9.2
Nov-09-1999
32
16.7
7.0
4,510
54.1
9.3
Nov-10-1999
31
16.8
6.6
4,390
54.7
9.1
Nov-11-1999
30
16.8
6.5
4,070
37.4
6.1
Nov-12-1999
31
16.6
6.6
4,090
36.1
6.0
Nov-13-1999
29
16.4
6.5
4,030
42.5
6.6
Nov-14-1999
29
16.4
6.4
4,010
43.7
6.8
Nov-15-1999
28
16.6
6.3
4,000
45.1
6.8
Nov-16-1999
28
16.7
6.9
4,260
48.0
7.2
Nov-17-1999
27
16.3
6.7
4,070
39.0
5.7
Nov-18-1999
29
15.7
7.0
4,160
35.3
5.5
Nov-19-1999
30
14.6
P
4,230
34.9
5.6
Nov-20-1999
30
14.5
P
4,290
41.8
6.8
Nov-21-1999
28
14.2
P
4,200
33.3
5.0
Nov-22-1999
26
11.9
P
4,280
33.9
4.8
Nov-23-1999
25
11.6
P
4,480
37.3
5.0
Nov-24-1999
24
11.6
P
4,200
38.4
5.0
Nov-25-1999
23
11.5
P
3,960
28.6
3.5
Nov-26-1999
27
11.7
P
4,360
46.2
6.7
Nov-27-1999
29
12.0
P
4,220
38.9
6.1
Nov-28-1999
30
12.0
P
4,280
38.5
6.2
Nov-29-1999
29
11.8
P
4,320
36.6
5.7
Nov-30-1999
29
12.2
P
4,460
36.4
5.7
 
.
.
.
.
.
.
Mean
29
15.1
6.9
4,340
41.1
 
Total
 
 
 
 
 
193
Load Limitation for November 1999 (lbs)
348