SITE

SITE DESCRIPTION

AGENCY

FREQUENCY

PARAMETERS

MONITORED
 
TECHNIQUES AND SENSORS
 
A

 
San Luis Drain @ Check 17
 
USBR
 
daily
 
stage

electrical conductivity

temperature
 
staff gauge

field/lab EC

thermometer

 

B

 
San Luis Drain between

Check 1 and terminus
 
USBR
 
15 minutes
 
stage

electrical conductivity

temperature
 
acoustic doppler sensors

nitrogen bubbler pressure transducer

flow through EC probe

built into EC probe

 

D

 
Mud Slough near Gustine
 
USGS
 
15 minutes
 
stage
 
nitrogen bubbler pressure transducer
         
electrical conductivity
 
flow through EC probe
         
temperature
 
built into EC probe
           
 
E
 
Mud Slough @ Highway 140
 
USGS
 
bi-monthly
 
stage
 
staff gauge
         
velocity
 
current meter
           
 
F
 
Salt Slough at Highway 165
 
USGS
 
15 minutes
 
stage
 
nitrogen bubbler pressure transducer
         
electrical conductivity
 
flow through EC probe
         
temperature
 
built into EC probe
           
 
J
 
Camp 13 Canal
 
GWTF
 
daily
 
stage over weir board
 
weir stick
   
north of Main Canal
       
           
 
L
 
Santa Fe Canal

at Henry Miller Road

 
GWTF
 
daily
 
stage over weir

boards
 
weir stick
           
 
N
 
Crows Landing Bridge
 
USGS
 
15 minutes
 
stage
 
nitrogen bubbler pressure transducer
         
electrical conductivity
 
flow through EC probe
         
temperature
 
built into EC probe