Continuous water monitoring at Station B (discharge from San Luis Drain), August 2000.

Show explanation of footnotes and agency abbreviations

PARAMETER Flow Temperature Boron Specific Conductance Selenium (total) Selenium (total) Load
DATA SOURCE USBR USBR CVRWQCB CVRWQCB CVRWQCB Computed
UNITS cfs °C mg/L µS/cm µg/L lbs
Aug-01-2000
57
28.5
7.2
3,980
37.6
11.6
Aug-02-2000
55
29.0
6.9
3,830
37.6
11.2
Aug-03-2000
60
29.1
6.6
3,840
42.6
13.8
Aug-04-2000
59
28.5
6.9
3,770
34.4
10.9
Aug-05-2000
58 e
NA
6.7
3,670
33.1
10.4
Aug-06-2000
54 e
NA
6.9
4,110
48.0
14.0
Aug-07-2000
53 e
NA
6.6
3,700
33.5
9.6
Aug-08-2000
57
26.7
6.7
3,690
31.8
9.8
Aug-09-2000
55
26.5
7.1
3,840
35.8
10.6
Aug-10-2000
57
26.2
6.8
3,710
36.0
11.1
Aug-11-2000
56
25.7
6.7
3,650
36.0
10.9
Aug-12-2000
56
26.5
6.9
3,820
36.4
11.0
Aug-13-2000
54
26.9
6.8
3,650
30.1
8.8
Aug-14-2000
52
27.0
6.7
3,640
28.3
7.9
Aug-15-2000
50
27.0
6.1
3,320
23.3
6.3
Aug-16-2000
50
27.0
6.3
3,420
24.5
6.6
Aug-17-2000
49
27.2
6.3
3,450
24.7
6.5
Aug-18-2000
55
26.9
6.8
3,730
28.4
8.4
Aug-19-2000
67
26.2
6.8
3,870
34.6
12.5
Aug-20-2000
66
25.5
6.2
3,600
30.4
10.8
Aug-21-2000
63
25.2
5.2
3,160
27.7
9.4
Aug-22-2000
57
25.6
5.5
3,340
31.0
9.5
Aug-23-2000
56
25.5
5.5
3,250
39.0
11.8
Aug-24-2000
58
25.3
6.1
3,530
30.9
9.7
Aug-25-2000
59
25.6
6.3
3,540
29.2
9.3
Aug-26-2000
55
26.1
6.2
3,670
40.0
11.9
Aug-27-2000
56
26.4
5.8
3,420
37.6
11.4
Aug-28-2000
57
26.5
5.8
3,440
31.2
9.6
Aug-29-2000
56
25.2
6.4
3,770
36.7
11.1
Aug-30-2000
59
23.9
6.5
3,870
44.7
14.2
Aug-31-2000
55
23.7
6.5
4,000
44.6
13.2
Mean
56
26.4
6.4
3,650
34.2
 
Total
 
 
 
 
 
324
Load Limitation for August 2000 (lbs)
480